Transmission Line EPC · Nepal

We carry the power across the Himalaya.

From survey and design to towers on the ridge — Karmasiddha builds the 132 kV lines that connect Nepal's hydropower to the grid.

Truck arriving with tower section0%

← Drag across the scene to build the line →

5+
Hydropower projects
132 kV
Line expertise
145 MW+
Capacity served
100%
In-house EPC
Crew erecting a transmission tower on a Himalayan ridge
Kapan, KTM
Registered office

About us

Built for the hardest terrain on earth

Karma Siddha Construction and Supplies Private Limited is a Nepal-based construction company registered at Ward No. 11, Kapan, Budhanilkantha Municipality, Kathmandu. We specialise in transmission line construction and hydropower infrastructure — delivering EPC services, surveys, feasibility studies, design, civil works and the supply of transmission line materials.

Our crews work on steep ridgelines, river gorges and remote districts where every tower section is carried, lifted and bolted by hand and crane. Safety, precision and on-time energisation define how we work.

  • Safety-first sites
  • NEA standard compliance
  • Mountain logistics
  • End-to-end delivery

What we do

Services we provide

01

Transmission Line EPC

Turnkey engineering, procurement and construction of 33–132 kV lines, from foundations to stringing and commissioning.

02

Survey & Feasibility

Route alignment, topographic and geotechnical surveys, and feasibility studies across Himalayan terrain.

03

Design & Engineering

Tower spotting, sag-tension analysis, foundation and structural design to NEA standards.

04

Civil Works

Tower foundations, access tracks, retaining structures and hydropower-related civil infrastructure.

05

Material Supply

Lattice towers, conductors, insulators, hardware fittings and earthing materials sourced and delivered on time.

06

Hydropower Infrastructure

Evacuation and interconnection works that link generating stations to the national grid.

Track record

Notable projects

01

Liping Khola HPP

Sindhupalchok · 16.26 MW

Main EPC Contractor

Built the complete 132 kV transmission line and tower infrastructure evacuating power to the NEA interconnection point.

02

Sabha Khola HPP

Sankhuwasabha · —

Civil Works Contractor

Executed transmission line civil works in close coordination with the main contractor.

03

Chhujung Khola HPP

Sankhuwasabha · 63 MW

Study, Survey & Design

Delivered transmission line study, route survey and design services.

04

Bakan Khola HPP

Nepal · 44 MW

Study, Survey & Design

Undertook transmission line study, survey and design-related work.

05

Upper Chaku-A HPP

Sindhupalchok · 22.2 MW

Material Supplier

Supplied the transmission line materials required for project implementation.

Leadership

Founders & Directors

Mewang Sherpa

Founder / Executive Director

Mewang Sherpa

Raja Ram Pokhrel

Director

Raja Ram Pokhrel

Project team

Engineers & Site Leads

Prakash Thapa

Head of Operation

Prakash Thapa

Abinash Kumar Sah

Head of Procurement, Commercial & Tendering

Abinash Kumar Sah

Kishor Thapa

Project Manager

Kishor Thapa

Rohan Giri

Construction Manager

Rohan Giri

Sanjika Basnet

Finance & Account Manager

Sanjika Basnet

Manish Kumar Chaudhary

Head Logistics & Store

Manish Kumar Chaudhary

Rachana Pokhrel

Business Analyst

Rachana Pokhrel

Lokraj Joshi

Civil Engineer

Lokraj Joshi

Jayendra Sah

Civil Engineer

Jayendra Sah

Puskar Pandey

Social Relationship Management Officer

Puskar Pandey

Akash Kunwar

Sales & Commercial Officer

Akash Kunwar

Tirtha Bahadur Tamang

Surveyor / Supervisor

Tirtha Bahadur Tamang

Have a line to build?
Let's talk.

Talk with us →

Contact us

Get in touch

Registered office

Ward No. 11, Kapan, Budhanilkantha Municipality, Kathmandu, Nepal

Phone

+977-1-XXXXXXX

Email

info@karmasiddha.com.np

Talk with us